Consultancy services for design review and construction supervision of drainage improvement works in Kampala
PUBLISHED — 17th, January 2019The Kampala Capital City Authority has received financing from the World Bank towards the cost of the Second Kampala Institutional and Infrastructure Development Project and intends to apply part of the proceeds for consulting services.
The consulting services (“the Services”) include provision of design review and construction supervision services for drainage improvement works on Lubigi Primary and Nakamiro Secondary Drainage Channels. The major works will include realignment, expansion and lining of at least 2.58 km of primary drainage channels and 3.28 km of secondary channels as well as construction of associated cross culverts, upgrading several multi-cell culvert crossings and maintenance of access roads. In some instances, it will be necessary to reinstate roads (at the drainage crossings) to the same levels, dimensions and structural strength as before the works. Existing foot bridges will be rehabilitated and new pedestrian channel crossings will be installed at designated positions. Selected right-of-way sections of the rehabilitated channels will be landscaped as per the KCCA’s specifications.
DOWNLOAD FULL ADVERT
More Procurement Notices
- PROCUREMENT OF LAND ALONG THE NORTHERN BYPASS CORRIDOR (FROM NAALYA TO SENTEMA ROUND ABOUTS) FOR THE CONSTRUCTION OF A LORRY PARK, BUS DEPOT AND A PUBLIC TRANSPORT TERMINAL(LOT1) RE-TENDER II
19th, March 2026 - Consultancy Services for Supervision of Construction of Ggaba Market in Makindye Division under GKMA-UDP
10th, March 2026 - INVITATATION TO BID FOR THE CONSTRUCTION OF GGABA MARKET IN MAKINDYE DIVISION
10th, March 2026 - Procurement of land outside the Northern or Southern By-pass corridor for the construction of a Bus Depot (Lot 2) (Re-tender IV)
24th, November 2025 - Notice of Award: Upgrading to paved standard of 4.1km and reconstruction of 5km of Mpererwe-Kiteezi-Kiti Road in Kawempe Division and Wakiso District (Lot 6)
30th, September 2025 - Invitation to bid for Provision of Consultancy Services for Supervision of Construction of Batch 1B Roads in Kampala Capital City Authority under GKMA-UDP
13th, August 2025







Development partners